Mill Planning & Organization (ETEF703)
Unit-1: Selection of site for a textile mill (2). Preparation of project report (2). Construction of building of a textile mill (2). Types of buildings, single and multistoried buildings. Fire hazards and their control (1). Prevention tours accidents (1) Total of lectures required=9 Unit-2: Humidification of a textile mill (1). Humidifiers and dehumidifiers (1). Types of humidifiers (2). Different systems of ventilation system used in textile mill (1). System of lighting used in textile mill (2) Total of lectures required=7 Unit-3: Balancing of machines for spinning and weaving machines or balancing of machines for bleaching (4). Dyeing, Printing and Finishing department. Layout of different machines of spinning, weaving process house (3). Total of lectures required=7 Unit-4: Costing (1), elements of cost, fixed and variable cost (1). Knowledge of cost cancellation for spinning (2), weaving and processing department. Viability evaluation of a project (1). Break even point (1) Types of staff organization (2). Total of lectures required=8 89 Unit-5: Different system wages used in textile industry (2), working of sales and purchase system (2). Material handling used in a textile mill (2). Maintenance of machines and safety devices used in a textile mill (2). Inventory controls (2) Resource Planning. Total of lectures required=10 Total of lectures required=41
Reference Books Reference Books 1. Industrial Engineering, Organization & management by Tarachand 2. Industrial Economics & Principle of Management by T.M. Chabra 3. Industrial Economics & Principle of Management by S. K Sharma
For more details, visit http://www.uptu.ac.in/academics/syllabus/syllabus_textile_chem_texteng_mmft.pdf
|
No responses found. Be the first to respond and make money from revenue sharing program.
|